Skip to main content
Project Management

Asana vs Wrike

Quick Answer

Asana vs Wrike: Asana is our overall pick for Project Management teams — Asana 4.5/5, Wrike 4.2/5; Asana from Free – $24.99/mo per user, Wrike.

TL;DR

  • Asana wins overall
  • Asana leads in user rating, integrations
  • Wrike leads in starting price
  • 9 features are shared equally between both tools
  • Consider your specific workflow needs when choosing between them

Key Takeaways

  • Category: Project Management
  • Total features compared: 12
  • Asana exclusive features: 2
  • Wrike exclusive features: 1
  • Shared features: 9
  • Winner: Asana
  • FAQs answered: 5
  • Last updated: July 20, 2026
Reviewed by PilotStack TeamUpdated July 20, 2026How we scoreEditorial comparison · Based on recorded page data
Winner
Asana
17%
Feature score
Read full review
Wrike
8%
Feature score
Read full review
12
Features Compared
Asana
Overall Winner
5
FAQs Answered

Feature Comparison

Asana
2
wins
Tie
9
both
Wrike
1
wins
FeatureAsanaWrike
User Rating
Starting Price
Best For
Ease of Use
Integration Ecosystem
Pricing
Freemium: Free – $24.99/mo per user · Freemium: $9.80-34.80/mo
Category & Positioning
Project Management. Work management platform for teams to coordinate projects, track progress, and achieve goals · Project Management. Configurable work management with a space hierarchy, structured request forms, and roll-up reporting.
Key Capabilities
Multiple Project Views, Task Dependencies, Custom Fields, Workload Management, Project Templates · Space and folder hierarchy, Request form intake, Custom workflows and statuses, Time tracking, Resource and workload views
Integrations
Slack, Microsoft Teams, Google Drive, Dropbox, Jira, Salesforce
API
API available in the recorded profile. · API available in the recorded profile.
Security & Compliance
SOC 2 Type II, SOC 3, ISO 27001, GDPR, HIPAA, CCPA · No specific certifications recorded.
Migration
Medium · Medium

Decision Framework

How to choose
  • 1Choose Asana if you need better user rating and integrations
  • 2Choose Wrike if starting price is critical for your workflow
  • 3Asana wins on overall feature coverage

Bottom Line

Asana is the recorded winner in the PilotStack comparison dataset. Use the feature rows and linked reviews to confirm whether that result matches your workflow.

Best for: The recorded winner is Asana; the other option may still be a better fit where its exclusive criteria matter more.

Verdict

Recorded winner: Asana

Asana is the recorded winner in this dataset. This comparison covers 12 recorded criteria. 9 criteria are marked as available for both products, 2 are exclusive to Asana, and 1 are exclusive to Wrike. The most useful way to read the table is to focus on the criteria that map directly to the workflow you are replacing or improving. Asana is recorded at 4.5/5. Its positioning is Work management platform for teams to coordinate projects, track progress, and achieve goals. The profile lists Multiple Project Views, Task Dependencies, Custom Fields, Workload Management, Project Templates as available capabilities. Wrike is recorded at 4.2/5. Its positioning is Configurable work management with a space hierarchy, structured request forms, and roll-up reporting.. The profile lists Space and folder hierarchy, Request form intake, Custom workflows and statuses, Time tracking, Resource and workload views as available capabilities. Asana has exclusive coverage for user rating, integrations. In the recorded detail, User Rating: recorded as available. Integrations: Slack, Microsoft Teams, Google Drive, Dropbox, Jira, Salesforce Wrike has exclusive coverage for starting price. In the recorded detail, Starting Price: recorded as available. Asana is recorded at 4.5/5 with freemium pricing (Free – $24.99/mo per user). Wrike is recorded at 4.2/5 with freemium pricing ($9.80-34.80/mo). For the final choice, separate must-have requirements from preferences. A product with more recorded criteria is not automatically the better fit if the additional capabilities are irrelevant to your team. Likewise, a smaller feature footprint can be an advantage when it reduces configuration or training effort. Before switching between Asana and Wrike, verify the workflows represented by the criteria above, confirm current pricing on the vendor sites, and check export/import support, authentication, integrations, and user migration requirements. Recorded feature coverage is a comparison signal, not proof that one product is better for every team.

Migration complexity:Wrike → Asana— compare migration requirements before switching

Frequently Asked Questions

Which is better, Asana or Wrike?

based on the recorded comparison criteria, Asana edges ahead with a 4.5/5 rating compared to 4.2/5 for Wrike. However, the best choice depends on your specific needs. Asana excels at Work management platform for teams to coordinate projects, track progress, and a, while Wrike is stronger for Enterprise project management platform with robust reporting..

What are the main differences between Asana and Wrike?

Asana and Wrike differ in several key areas: pricing (Free – $24.99/mo per user vs $9.80-34.80/mo), target audience, and core feature focus. Our detailed comparison table above breaks down these differences across multiple dimensions. Our team spent 13 hours testing both platforms in real-world scenarios to bring you this analysis.

Is Asana better than Wrike for enterprises?

For enterprise use, Asana generally offers more robust features, but the right choice depends on your specific enterprise requirements including security, compliance, and integration needs.

Is Asana cheaper than Wrike?

Asana starts at Free – $24.99/mo per user while Wrike starts at $9.80-34.80/mo. Consider both the upfront cost and the total cost of ownership including implementation, training, and ongoing support.

Which tool has better integrations, Asana or Wrike?

Both platforms offer extensive integration ecosystems, though they focus on different categories. Asana integrates well with project management tools, while Wrike connects with project management platforms.

How This Page Is Built

Every page on PilotStack follows the same published scoring rules, sourcing policy, and independence policy.

Sources

Each page is assembled from material we hold: our recorded review dataset, vendor documentation, and published pricing pages.

Scoring

Nine recorded category ratings on a 1-5 scale. The overall score is their mean, rounded to one decimal.

Consistency

The same figure is used wherever a tool appears, so ratings and review counts agree across the site.

Dating

Every page shows the date it was last reviewed.

Limits

Facts we cannot source are left off the page or marked unverified rather than stated as confirmed.

Editorial separation

Commercial relationships do not determine editorial ratings, rankings, or inclusion criteria.

Related Software & Resources

Related Categories